👑 Free campaign · chapter 5 Free
Tycoon Valley
Chapter five: a river valley between two mountain sides. Big land, big expectations: guests are picky, rides wear out fast and money is tight.
- 80 × 80
- tile map
- ★★★★★
- difficulty
- $10,000
- starting cash
- Year 3
- goal by
In the game
A river valley between two mountain sides. Big land, big expectations: guests are picky, rides wear out fast and money is tight.
Tycoon difficulty: faster breakdowns, stricter guests. The river cuts the valley in two: the far bank and the upper valley need bridges.
Tycoon Valley plays on the Tycoon difficulty: rides lose reliability half as fast again as usual, and guests are harder to please. The map is a big one: a wide valley floor by the gate, pine-wooded mountain sides, and a river that comes down from the north and turns out east through a gorge, so the far bank and the upper valley need bridges. The goal is the biggest crowd of the campaign with a high rating and a path across the river, over three years.
Everything the earlier chapters taught matters here at once: terrain, a clean park, good staff, fair prices and a steady flow of new rides through research. It is the chapter where planning the park’s layout before building pays off most.

The map
Tycoon Valley is a 80 × 80 tile map of a river valley between two mountain sides, played on the Tycoon setting. You start with $10,000 in cash and a loan of $20,000 at 16% interest, and the bank lends up to $40,000. Research starts with a budget of $300. It is free: a chapter of the free campaign. On Tycoon, rides wear half as fast again and guests are harder to please.
Goals
The goal on Normal: 600 guests with a rating of 700, a path across the river and the loan paid off, by the end of Year 3.
On Hard: 650 guests with a rating of 760, a path across the river and the loan paid off, by the end of Year 3. A bigger crowd and a higher rating, on the same tycoon rules. You start with $10,000.
On ♛ Baron: 700 guests with a rating of 800, a path across the river and the loan paid off, by the end of Year 3. Baron rules: the strictest guests, the fastest wear, a quarter less cash, a bigger crowd and a higher rating than Hard, and the loan paid off. You start with $7,500.
Bonus goals: Park value above $80,000; Profit of $10,000 in one month; Five-star newspaper review; Average review 4.0★ or better for 6 days.
Ready to build from the start: Merry-Go-Round, Spinning Teacups, Ferris Wheel, Bumper Cars, Burger Bar, Drinks Stall, Ice Cream Kiosk, Popcorn Stand, Balloon Stall, Toilets, Information Kiosk, Swing Ride and Junior Coaster; everything else is researched.
Building tips
- Spend the first year on a solid core: gentle rides, food, toilets and staff.
- Keep research running all the time: the starting kit is small.
- Watch reliability on every ride: breakdowns cost rating and reviews.
The starting kit
Maps like it
Every park has a story
Your park is waiting
The gates open tonight. Free to play, no install, no card needed.

